Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric)

Location: HCB
Project Type: Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric)

The main objective of this project is the design, installation and commissioning of a state-of-the-art fire prevention and firefighting system in the Cahora Bassa Hydroelectric (HCB), one of the largest energy infrastructure in the region.

02