Repair of power transformers, generators, switches, RMUs, inverters, engines and a wide range of electrical equipment

Repair of power transformers, generators, switches, RMUs, inverters, engines and a wide range of electrical equipment

Repair of power transformers, generators, switchesgears, RMUs, inverters, engines and a wide range of electrical equipment Local: Maputo Project Type: Repair of power transformers, generators, switches, RMUs, inverters, engines and a wide range of electrical equipment MESAT, Lda is working on repairing power transformers.

13/04/2026
Tap changers replacement in 30 MVA power transformer for EDM

Tap changers replacement in 30 MVA power transformer for EDM

Tap changers replacement in a 30 MVA power transformer for EDM Local: Maputo Project Type: Tap changers replacement in 30 MVA power transformer for EDM MESAT, Lda is working with MR to replace tap changers in a power transformer.

11/12/2025
33 kV Medium Voltage Switchgears

33 kV Medium Voltage Switchgears

33 kV Medium Voltage Switchgears Local: Maputo Project Type: 33 kV Switchgears of Medium Voltage Acceptance on site, installation and commissioning. MESAT, Lda covers the full scope for any voltage level, and ensures that the design complies with IEC standards. Linkedin 02

11/11/2025
Construction of Infrastructure for Liquid Oxygen Tanks in Mozambique Hospitals

Construction of Infrastructure for Liquid Oxygen Tanks in Mozambique Hospitals

Infrastructure Construction for Gas Tanks Liquid in Mozambique Hospitals Location: Mozambique Project Type: Infrastructure Construction for Gas Tanks Liquid in Mozambique Hospitals We, the MESAT, Lda, are moving forward with building civil foundations for gas tanks in 10 hospitals across

10/10/2025
11kV Switchgear Commissioning in Maputo by MESAT

11kV Switchgear Commissioning in Maputo by MESAT

11kV Switchgear Commissioning in Maputo by MESAT Location: Maputo Project Type: 11kV switchgear commissioning in Maputo by MESAT This task validates that all components operate as planned and meet the design requirements. Linkedin 02

01/10/2025
Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric)

Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric)

Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric) Location: HCB Project Type: Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric) The main purpose of this project is to design, install and commission a system

23/09/2025
Gondola District Main Substation: Maintenance of switches under load

Gondola District Main Substation: Maintenance of switches under load

Gondola District Main Substation: Maintenance of switch under load Local Services: Gondola District Project Type: Gondola District's Main Substation: Maintenance of switches under load The Gondola District's Main Substation is a critical infrastructure for the supply and distribution of electricity in the

29/05/2025
Installation and installation of 33 kV apparatus for power factor correction (PFC) for the NACAL EDM

Installation and installation of 33 kV apparatus for power factor correction (PFC) for the NACAL EDM

Installation and installation of 33 kV switchgear for power factor correction (PPC) for NACAL EDM Locations: Nacala Project Type: Installation and installation of 33 apparatus kV for power factor correction (PFC) for Nacala EDM Between the days

09/05/2025
On-load Tap Changers

On-load Tap Changers

On-load Tap Changers Locations: Main Substation of Morning District Project Type: On-load Tap Changers In the context of the preventive and corrective maintenance of critical electrical infrastructure, the maintenance of switches under load in the Main Substation was carried out.

09/05/2025
Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA)

Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA)

Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA) Local Services: Maputo Thermal Center and Infulene DTSU Project Type: Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA) DGA analysers allow for incipient failures in power transformers, such as partial discharges,

09/05/2025
Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda.

Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda.

Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda. Locations: Maputo Project Type: Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda. The project consists of the installation and commissioning of a 33 kV switchgear GIS

31/03/2025
Average Voltage Services at Our Workshop in Maputo

Average Voltage Services at Our Workshop in Maputo

Medium Voltage Services at Our Workshop in Maputo Local Services: Maputo Project Type: Provision of Media Services Voltage at the Maputo Workshop Our workshop in Maputo is equipped to provide a wide range of medium voltage services, ensuring efficient and secure solutions for electrical equipment.

03/03/2025
Installation and commissioning of the DGA (dissolved gas analyser) in a 400 MVA Transformer

Installation and commissioning of the DGA (dissolved gas analyser) in a 400 MVA Transformer

Installation and commissioning of the DGA (dissolved gas analyser) in a 400 MVA Transformer Location: Matola, Maputo Project Type: Installation and commissioning of a High Voltage Transformer Monitoring System Recently, the installation and commissioning of a dissolved gas analyser (DGA) has been successfully completed in a

03/03/2025
Solar System for Fuel Supply Post – Manica – Supply and Installation.

Solar System for Fuel Supply Post – Manica – Supply and Installation.

Solar System for Fuel Supply Station - Manica - Local Supply and Installation: Manic Project Type: Supply and installation of solar system The solar system at the fuel supply station in Mavonde, Manica, aims to implement a sustainable energy solution to meet the needs of

23/11/2024
Central Construction Solar Campo – Mopeia – Zambézia

Central Construction Solar Campo – Mopeia – Zambézia

Central Construction Solar Campo - Mopeia - Zambézia Location: Zambezia Project Type: Solar Central The construction of the solar power station in Campo, in the district of Mopeia, in the province of Zambézia, represents a milestone for the expansion of renewable energy in the region. This project aims to provide clean and sustainable energy for

22/11/2024
Solar system luenha fuel supply station – Tete supply and installation

Solar system luenha fuel supply station – Tete supply and installation

Solar system luenha fuel supply station - Tete supply and installation Location: Tete Project Type: Solar System The solar system installed at the fuel supply station in Luenha, Tete, offers a sustainable and efficient solution to the fuel supply station. Implementation includes

22/11/2024
Pafuri solar central construction – Gaza

Pafuri solar central construction – Gaza

Central Construction Solar Pafuri - Gaza Location: Gaza Project Type: Construction of Solar Power Plant The construction of the Pafuri solar power station in Gaza represents a milestone in sustainable energy development in Mozambique. This project aims to harness the abundant solar energy of the region to meet the growing demand of

22/11/2024
Solar central construction Mualadzi – Chifunde – Tete

Solar central construction Mualadzi – Chifunde – Tete

Central Construction Solar Mualadzi - Chifunde - Tete Local: Mualadzi - Chifunde - Tete Project Type: Construction of Solar Power Plant The construction of the solar power station in Mualadzi, Chifunde, Tete province, represents a milestone in access to sustainable energy. This project will bring direct benefits to the community, including

22/11/2024
Installation and commissioning of SCADA in the substations of Marromeu and Chimuara

Installation and commissioning of SCADA in the substations of Marromeu and Chimuara

Installation and commissioning of SCADA in the substations of Marromeu and Chimuara Local: Chimuara and Marromeu Project Type: SCADA Installation and Commissioning MESAT is pleased to announce the successful completion of the SCADA Installation and Commission project in the Substations of Marromeu and Chimuara. This SCADA system

05/06/2024
150kWp-500kWh, Solar Storage for Data Center – Ministry of Earth and Environment by MESAT, Lda.

150kWp-500kWh, Solar Storage for Data Center – Ministry of Earth and Environment by MESAT, Lda.

150kWp-500kWh, Solar Storage for Data Center – Ministry of Earth and Environment by MESAT, Lda. Location: Maputo Project Type: Solar Storage The 150 kWp solar installation with storage of 500 kWh for the Data Center of the Ministry of Earth and Environment, carried out by MESAT, Lda., represents a breakthrough

07/05/2024
33 kV Transmission Line Implementation Project: Machava – Maputo

33 kV Transmission Line Implementation Project: Machava – Maputo

Construction of the transmission line 33 kV Machava - Maputo by MESAT, Lda Location: Maputo - Matola Project Type: Construction of the transmission line The construction of the 33 kV transmission line in the region between Matola and Maputo, conducted by MESAT, marks a significant advance in development and in the

27/03/2024