SCADA Projects for Substations – From Zero to Success Project Type: SCADA Projects for Substations – From Zero to Success Linkedin 02
Installation and commissioning of SCADA system for 110 kV substation Project Type: Installation and commissioning of SCADA system for 110 kV substation Linkedin 02
Solarization Project Completed Successfully Places: Northern Mozambique Project Type: Solarisation MESAT is pleased to announce the successful completion of an important solarisation project in northern Mozambique, which has now provided clean, reliable and sustainable electricity to hundreds of households in the beneficiary community. O
ABB Gas Cell Assembly in the Substations of Matola Rio and Macia 02
Installation of a 136.4 kWp Photovoltaic Solar System Location: Pemba Project Type: Installation of a 136.4 kWp Photovoltaic Solar System MESAT, Lda is proud to announce the successful installation of a PV system connected to the network, with a capacity of 136.4 kWp, associated with a
Repair of power transformers, generators, switchesgears, RMUs, inverters, engines and a wide range of electrical equipment Local: Maputo Project Type: Repair of power transformers, generators, switches, RMUs, inverters, engines and a wide range of electrical equipment MESAT, Lda is working on repairing power transformers.
Tap changers replacement in a 30 MVA power transformer for EDM Local: Maputo Project Type: Tap changers replacement in 30 MVA power transformer for EDM MESAT, Lda is working with MR to replace tap changers in a power transformer.
33 kV Medium Voltage Switchgears Local: Maputo Project Type: 33 kV Switchgears of Medium Voltage Acceptance on site, installation and commissioning. MESAT, Lda covers the full scope for any voltage level, and ensures that the design complies with IEC standards. Linkedin 02
Infrastructure Construction for Gas Tanks Liquid in Mozambique Hospitals Location: Mozambique Project Type: Infrastructure Construction for Gas Tanks Liquid in Mozambique Hospitals We, the MESAT, Lda, are moving forward with building civil foundations for gas tanks in 10 hospitals across
11kV Switchgear Commissioning in Maputo by MESAT Location: Maputo Project Type: 11kV switchgear commissioning in Maputo by MESAT This task validates that all components operate as planned and meet the design requirements. Linkedin 02
Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric) Location: HCB Project Type: Drawing Assembly and Commissioning of a Fire System for HCB (Cahora Bassa Hydroelectric) The main purpose of this project is to design, install and commission a system
Gondola District Main Substation: Maintenance of switch under load Local Services: Gondola District Project Type: Gondola District's Main Substation: Maintenance of switches under load The Gondola District's Main Substation is a critical infrastructure for the supply and distribution of electricity in the
Photo Gallery Our Lemas 01 Our Business Profile Project 1 Project 2 Project 3
Installation and installation of 33 kV switchgear for power factor correction (PPC) for NACAL EDM Locations: Nacala Project Type: Installation and installation of 33 apparatus kV for power factor correction (PFC) for Nacala EDM Between the days
On-load Tap Changers Locations: Main Substation of Morning District Project Type: On-load Tap Changers In the context of the preventive and corrective maintenance of critical electrical infrastructure, the maintenance of switches under load in the Main Substation was carried out.
Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA) Local Services: Maputo Thermal Center and Infulene DTSU Project Type: Installation and commissioning of DOBLE Dissolved Gas Analyzers (DGA) DGA analysers allow for incipient failures in power transformers, such as partial discharges,
Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda. Locations: Maputo Project Type: Installation and commissioning of a 33 kV GIS switchgear for EDM by MESAT, Lda. The project consists of the installation and commissioning of a 33 kV switchgear GIS
Medium Voltage Services at Our Workshop in Maputo Local Services: Maputo Project Type: Provision of Media Services Voltage at the Maputo Workshop Our workshop in Maputo is equipped to provide a wide range of medium voltage services, ensuring efficient and secure solutions for electrical equipment.
Installation and commissioning of the DGA (dissolved gas analyser) in a 400 MVA Transformer Location: Matola, Maputo Project Type: Installation and commissioning of a High Voltage Transformer Monitoring System Recently, the installation and commissioning of a dissolved gas analyser (DGA) has been successfully completed in a
Complaints / Complaints / Suggestions 01 His Opinion Imports Matola City, Mozambique Josina Machel Avenue, nr 109-A, Machava Headquarters Contact us +258 86 420 6181 geral@mesat.co.mz Follow us on Social Networks Linkedin